CMRL's Revised Phase II Corridor 5 Alignment Near Koyambedu To Enable Straighter Route
Prime Minister's Office Directs Railway Board To Fast-Track Work On Long-Pending Chennai Metro Rail-MRTS Merger: Report
Chennai Set For Two New Transit-Oriented Developments As CMRL Plans High-Rise Hubs At Vadapalani, Mandaveli
Chennai Metro Breaks Record With Installation Of India’s Longest Precast U-Girder
Tamil Nadu Clears New Chennai Metro Corridor Along Outer Ring Road, 19 Stations From Koyambedu To Pattabiram
DMRC Secures Rs 5,870 Crore Contract For Operation And Maintenance of Chennai Metro Phase II Network
Chennai Metro Phase 2 Advances As First Trial Run On Mullaithottam–Poonamallee Stretch Begins
Chennai Metro Phase II Achieves 40 Per Cent Progress; First Stretch Of 9 Km Elevated Section Set To Open By December 2025
Chennai Metro Expansion: Revised Plan Integrates Elevated Road From Airport To Kilambakkam Bus Terminal
Chennai Metro Embarks On Major Property Development Initiative To Strengthen Connectivity, Non-Fare Revenue Streams
Coimbatore Metro: Chennai Metro Rail To Begin Land Acquisition In March 2025
Chennai Metro: Alstom Hands Over First Driverless Train Set For Phase II Project, To Be Tested On Poonamallee-Porur Stretch
Centre To Finance 65 Per Cent Of Estimated Cost Of Chennai Metro Phase 2: Finance Ministry
Union Cabinet Approves Chennai Metro Phase 2 Estimated To Cost Rs 63,246 Crore
Tamil Nadu CM Stalin's 'Cordial Meeting' With PM Modi For Contentious Chennai Metro And Samagra Shiksha Funds
Chennai Metro Phase II: Tamil Nadu Government Responsible For Entire Project Funding, No Equity From Centre
CMRL Revises Chennai Airport-Kilambakkam Line's Design To Slash Costs By Rs 1,000 Crore
Tamil Nadu Government Explores Multiple Metro Routes To Link Parandur And Meenambakkam Airports
Chennai Metro Corridor 3: Adyar River Tunnel Work Hampered By Geological Setbacks
Chennai Metro: CMRL To Introduce First Driverless Train By August
Mass Rapid Transport From Tambaram To Velachery? Chennai Metro To Revisit Feasibility
Chennai Metro: Rolling Stock Major Alstom Commences Production Of Driverless Trainsets For Phase-2
Chennai Metro Phase-2: Construction Of Underground Stations Begins On Corridor-3
Chennai Metro: CMRL Plans 93 Km Extension To Proposed Parandur Airport
Cyclone Michaung Takes Toll on Chennai Metro: Rs 254 Crore In Damages And Repairs Ahead
Chennai's Multimodal Integration: CMRL To Revamp 10 MTC Bus Terminus-Cum-Depots And Link Phase-2 Metro Stations
Chennai Metro: Future Network Blueprint Requires Rs 1 Lakh Crore Investment For 281 Km Expansion Beyond Phase-2
Chennai's Airport To Kilambakkam Metro Link Faces Uncertain Future Amidst Funding Woes
Chennai Metro Phase-II: Construction Of Tunnels Under Marina Beach To Start Soon
Chennai Metro Phase II: CMRL Signs Rs 1,063 Crore Contract For Station Construction In Corridor-3
Women's Safety In Focus: Chennai Metro Conducts Survey To Enhance Security And Convenience
Travel In Chennai Metro With WhatsApp Ticket: CMRL Launches Chatbot-Based QR Ticketing Solution
Chennai Metro: CMRL To Complete Barrier-Free Retrofitting Of Stations By May, Boosting Accessibility For Persons With Disabilities
Chennai Metro Phase II: CMRL Plans To Start 11-Km Madhavaram To Retteri Stretch By End Of 2026
Chennai Metro Phase-II: CMRL Scraps Plan To Lease 126 Coaches, To Float Tender For Procurement Of 42 Trains After Poor Response To Leasing Proposal
National Common Mobility: Chennai Metro And SBI Partner To Launch Singara Chennai Card For Seamless Transit In Chennai, Usable Across India
Chennai Metro Rail Phase II: Porur And Lighthouse Corridor Launch Pushed Back, Projected Inauguration Extended To 2026
Chennai: CMRL To Extend Metro Network To Kuthambakkam On CUMTA's Recommendation, To Provide Seamless Transit To Bengaluru
Chennai Metro Phase 2: Study For New Parandur Airport Link, 93 Kilometres New Lines To Be Ready Soon
Tamil Nadu Budget: Metro Rail Project For Coimbatore And Madurai, Rs 10,000 Crore For Chennai Metro Phase-II Work